top of page

ASSET CONDITION
MONITORING

ASCOM has been given the importance of emphasizing on the ISO/IEC 17025 accredited laboratory by offering its highly specialized service to clients.

 

Particularly, our team will provide a comprehensive on-site testing, measurement, and diagnostics for high voltage primary equipment. At the same time, we utilize the advanced technology and methodologies to ensure a precise and reliable assessments, helping to maintain the optimal performance and safety of your high voltage assets. As a result, we will assure clients a quality services with all evaluations that meet the highest industry standards.

AdobeStock_331323765.jpeg

KEEPING THE ENERGY FLOWING FOR GENERATIONS.

ENSURE PRECISE & RELIABLE ASSESSMENTS.

 TRANSFORMER 

Basic Test

  • Insulation & Winding Resistance

  • Turns Ratio Measurement

  • Dielectric Dissipation Factor/Tan Delta

  • Excitation Currents Measurement

  • Leakage Reactance Measurement

Advanced Test

  • Frequency Response Analysis (FRA)

  • Frequency Dielectric Spectroscopy (FDS)

  • On-line Acoustic Partial Discharge Measurement

  • Dynamic Winding Resistance Measurement (Tap Changer)

  • Vibro-acoustic Measurement (Tap Changer)

SWITCHGEAR

  • Thermography

  • Ultrasound

  • Internal Partial Discharge (TEV)

  • SF6 Leak Test

  • Trip Test (On-Line Timing)

  • SF6 Analysis

  • CB Timing Test

  • Insulation Resistance

  • Contact Resistance

  • Pressure Test

  • SF6 Laboratory Test

  • Vacuum Check

LIGHTNING & EARTHING

  • Lightning – Fault Correlation Assessment

  • Lightning Fault Investigations

  • Lightning Fault Mitigation Study

  • Power System Transient Modelling For Lightning Study

  • Lightning Performance Study

  • Lightning Overvoltage & Insulation Coordination Study

  • Earthing Design, Measurements & Analysis

  • Safe Earthing Assessment

  • Earthing Condition Assessment

  • Shaft Grounding Measurement, Assessment & Diagnosis For Generator Turbine Unit

  • Leakage Current Measurement For Isolated Phase Bus (IPB) Earthing System

  • Soil Resistivity & Earthing Resistance Measurement & Analysis

  • AC Interference Study

  • EMF study for facilities including data center, substation, tower etc.

ADVANCED EQUIPMENT MANAGEMENT

  • Primary Equipment Life Assessment

  • Advanced Asset Condition Health Index (Software based)

Gas Plant

YOUR REQUIREMENT MATCH OUR COMMITMENT.
GET YOUR PRIMARY EQUIPMENT TESTED NOW.

tnblabs wo background.png

Trusted Solution. Assured Services

A wholly-owned subsidiary of TNB Research.  

Our experts, are ready on your call.

  • Whatsapp
  • alt.text.label.LinkedIn
  • google
  • alt.text.label.Instagram
  • alt.text.label.Facebook

webmaster : tnbrqats@gmail.com

1_edited.png
2_edited.png
3_edited.png
4_edited.png
5_edited.png
bottom of page